RUSSIA, YEAKTERINBURG,
LENINA, 24/8, 620
Back call

JSC Mechel - Chelyabinsk Metallurgical Plant

JSC UKSH was general contractor of
2010 Chelyabinsk, Chelyabinsk region
2004-2010

Construction, installation and commissioning on the on ESPTs-6. Reconstruction of CCM of ladle-furnace and vacuum vessel section.

Installation works of the claw crane in the rolling shop 4. Major repair of the equipment.

Installation works of the claw crane of CCM. Major and running repairs in the rolling shop 3.

Running repairs in rolling shops 2,3,4.

Running repair of a carbon overloader.

Dismantling of the crane in rolling shop 1.

Major and running repair of forge and press complex 3  effort 355 t in KPTs.

Reconstruction of KKTs. Installation of blyumovy CCM 5, ladle-furnace 4 and vacuum vessel. Construction of cable transmissin line 35Kw, reconstruction of main step-down substation 7.

Construction of gas purification.

back to list