RUSSIA, YEAKTERINBURG,
LENINA, 24/8, 620
Back call

JSC Uraltrubprom

Pervouralsk, Sverdlovsk region
2007-2009, 2012

A full cycle of design and survey work.


Implementation of the full range of construction and installation works on the installation of foundations, installation of equipment, pipelines, metal structures, electrical installation and commissioning, using our own resources of the unique pipe-electric welding mill FFX25 by NAKATA (Japan) with the launch of the mill (9000tn).

Development of a working draft for the technical re-equipment of an industrial water supply system with a closed water cycle.