JSC Berezovsky electrometallurgical plant

Construction of the switchgear 10/0.4Kw, factory-assembled transformer substation. Commissioning within a "turnkey" construction of the block of treatment facilities and the stormwater drainage system of the rolling shop.
2009 Berezovsky, Sverdlovsk region
2007-2009