RUSSIA, YEAKTERINBURG,
LENINA, 24/8, 620
Back call

JSC Kyshtym Copper Electrolytic Plant

Construction of switchgears 10/0.4Kw, Factory-assambled transformer substations, installation of power electric equipment, commissioning within reconstruction of Copper foil electrolysis shop.
2007 Kyshtym, Chelyabinsk region
2006-2007

back to list